When a vendor answers a questionnaire, their responses land in the assessment review workspace. There you go through the questionnaire question by question, read each answer and the evidence attached to it, rate the answers that need a rating, approve or reject evidence, raise risks where you need to, and finally send your review to the vendor.
This guide covers how to open the review workspace, how to rate answers, how to handle evidence, comments and private documents, how to bring answers in from a spreadsheet, and what happens when you submit the review.
vendor:view and vendor:assessment:view to open the vendor's Assessment Process tab and the workspacevendor:assessment:review to save a rating and to submit the reviewvendor:risk:add if you want to raise risks from answersvendor:assessment:add if you also want to send remindersNavigation: Sidebar → Vendors → [select a vendor] → Assessment Process tab
The status dropdown has exactly three options:
There is no separate "Submitted" or "Reviewed" state. See How to Send and Track Questionnaires for how an assessment moves between the three.
| Item | What it is |
|---|---|
| Submitted By | The vendor's name and logo |
| Due Date | The assessment's due date |
| Review with ZIN AI | Opens the ZIN AI review panel. Shown only when the feature is switched on for your organisation. See How to Review Assessment Answers with ZIN AI |
| Import Assessment | Loads answers from a spreadsheet (see below) |
| Submit Reviews | Sends your review to the vendor (see below) |
| Cancel | Closes the workspace. Ratings you have already saved are kept |
These counts come straight from the vendor's responses, so they move as the vendor works through the questionnaire.
Click a category to expand it and see its questions, then click a question to load it on the right. Each category shows how many of its required questions are complete, and a tick once all of them are.
Icons beside a question tell you:
To find a specific question you can:
The question text (with a red asterisk if it is mandatory), the vendor's Answer, the evidence attached to it, your private documents and the comment thread.
Only questions set to Organisation Remark Required in the template get a rating. For those, an Organisation Review dropdown appears beside the answer. Other questions have no dropdown — you read them and move on.
A saved reason is shown under the answer in a Review Reason box whenever anyone opens that question.
For questions that do not need a rating, the button reads Next Question instead of Save & Next. Previous Question takes you back one question in either case.
If your language is set to English (US), the labels read Organization Review and Organization Remark Required.
Evidence the vendor attached is listed under the answer, headed by the evidence name set in the template.
The vendor sees each document's status in their portal.
If an answer reveals something that needs to be tracked as a risk:
A risk is created on the vendor's Manage Risk tab with the question text as its title and Assessment as its source. Open it there to assign, score and manage it. See How to Manage the Vendor Risk Lifecycle.
Each question has its own comment thread, so a discussion stays attached to the answer it is about. The most recent comment is shown as Previous Comment; Read All opens the Comments panel from the right, which has a search box.
This distinction matters: External comments are part of the exchange with the vendor, and the vendor is notified. Internal comments stay with your team. Choose the type deliberately before you post.
Other things worth knowing:
@ to mention a colleague works on Internal comments only.See How to Collaborate on Assessments for the full detail.
Alongside the documents the vendor shares, you can attach your own documents to a question — review notes, audit findings, internal evidence. They are listed under Private Documents, with the note "These documents won't be visible to the vendor".
Each private document has a menu with View and Delete. Deleting asks you to confirm and cannot be undone.
If a vendor sent you their answers in a spreadsheet rather than through the portal, you can load them into the assessment.
Use a .zip when you also have evidence files to bring in. Put the spreadsheet and the evidence files in the same zip, keep the spreadsheet's name the same as the assessment name, and list each evidence file by its exact file name in the Evidence File Name column (separate several files with commas).
After importing, a message tells you how many answers were imported, how many rows had errors and what the first error was, so you can correct those rows and import again. See How to Import and Export Data in Vendor Pulse for the full list of row errors.
When you have rated the answers:
What happens:
Two conditions apply:
If you are satisfied with every answer and need nothing more from the vendor, you do not have to submit a review — the assessment simply stays under Completed assessment with your saved ratings.
I can't see any vendor responses → The vendor may not have answered yet. Close the workspace and check the Completion Progress and Pending Questions columns on the assessment row.
There is no rating dropdown on a question → That question was not set to Organisation Remark Required in the template, so it does not take a rating.
The rating dropdown is greyed out → The vendor has not answered that question yet.
A rating did not save → The rating is saved when you click Submit Reason in the Review Reason dialog. If you closed that dialog without submitting, choose the outcome again. Saving also needs the vendor:assessment:review permission.
I opened the wrong cycle's assessment → A vendor accumulates one assessment per cycle, so the same vendor name appears on several rows. Check the Scheduled Date on the row before opening it.
Submit Reviews says there are no pending reviews → Nothing has been rated or changed since your last submission.
Submit Reviews is refused because the assessment has expired → The due date has passed. Extend it from the assessment row's Edit action and submit again.
The assessment disappeared from Completed assessment after I submitted → That is expected. Submitting the review reopens it for the vendor, so it is now under Ongoing assessment.
An evidence file will not preview → Only PDFs and images preview in the browser. Use Download for other file types.
I can't edit a comment I posted → Comments can only be edited by their author, and only for 15 minutes after posting. After that, post a follow-up comment.
A comment was rejected → A comment cannot be empty and cannot exceed 500 words.
The @ mention list does not open → Mentions work on Internal comments only. Switch the comment type to Internal.
A private document upload was rejected → Check the file type and the per-file and total size limits shown in the dialog.
My import brought in fewer answers than expected → The result message reports the number of errors and the first of them. Fix those rows in the downloaded template and import again.
I don't see Review with ZIN AI → The button appears only when the feature is enabled for your organisation. Contact us if you would like it turned on.
Need more help? Contact support@zeron.one